Main Pump station and pipeline of Gordian- Julfa Plain- (1996)
Project Description :
- Client: Agricultural land development and improvement Company
- Location: Julfa, Iran
- Contract Value: 3.046.235 US Dollar
- Type of Contract: P.C
- Progress: 100%
- Duration of Contract: 30 months
- Pump Station Capacity: 1.75 m3/sec with 14 Electro Motor- 4.4 MW/
- Pipeline: Steel pipe dia 900 mm and 4625-meter length
Golfaraj- Julfa Pump Station and Pipeline-(2002)
Project Description :
- Client: East Azerbaijan Regional Water Authority
- Location: Julfa, Iran
- Contract Value: 23.246.701 US Dollar
- Type of Contract: P.C
- Progress: 100%
- Duration of Contract: 48 months
- Project Specification: Supply agricultural water for the Golfaraj plain. The project consists of: Water intake on Aras river, sedimentation tank, pump station, main pipeline, supply, installation and startup of all the Mechanical and Electrical facilities. /
- pump station: Capacity 6 m3/sec- 10MW/
- Pipeline: steel and reinforced concrete pipe dia 2000 mm with 5 km length.
Sixth Pump Station and Pipeline of Moghan Plain-(1984)
Project Description :
- Client: East Azerbaijan Regional Water Authority
- Location: Dasht Moghan, Iran
- Contract Value: 1.816.930 US Dollar
- Type of Contract: P.C
- Progress: 100%
- Duration of Contract: 18 months
- Project Specification: Capacity: 2.7 m3/sec- 3.5 MW/
- Pipeline: Steel Pipe dia 1500 mm and 3000-meter length
Kish Island Sewage Pumping and Lifting Stations
Project Description :
- Geotechnical studies, construction of concrete structures of 8 pumping and lifting stations - construction of drainage valve ponds
- Client: Kish Investment and Development Company