Water and wastewater treatment plant

Construction of wastewater treatment plants in Hormozgan, Kerman, Sistan and Baluchestan and Yazd provinces

Project Description :

  • The main treatment in this treatment plant is done by anaerobic method and subsurface wetland (ABR & SF Wetland), A2O, MLE and Extended Aeroation.
  • The effluent of the treatment plant is intended for discharge to surface water and irrigation and agriculture.
  • Client: Water and Wastewater Engineering Company of the country

Wastewater Treatment Plant of Sari-(2008)

Project Description :

  • Client: Mazandaran Water and Wastewater Co.
  • Location: Sari, Iran
  • Type of Contract: EPC
  • progress: 100%.
  • Duration of contract: 36 months
  • Project Specification: The project has been executed with cooperation Iran Bastan in form of E.P.C.
  • Plant System: MLE

Construction works and equipment of drinking water purification plant and concrete storage reservoirs in Abhar city and Khoramdarah -(2012)

Project Description :

  • Client: Zanjan water and sewage
  • Location: Abhar, Zanjan, Iran
  • Type of Contract: P.C
  • Progress:100%
  • Duration of contract: 18 months

Pipeline and Wastewater Treatment Plant of Birjand-(2015)

Project Description :

  • Subject: procurement of plant design supply and installation of wastewater transmission line and treatment plant of Birjand city
  • Client: Southern Khorasan Water and Wastewater Co.
  • Location: Birjand, Sothern Khorasan, Iran
  • Type of Contract: E.P.C
  • Progress: In progress
  • Duration of contract: 36 months
  • Project Specification: The implementation of 10 km sewer pipelines, pump stations and wastewater treatment Birjand.
  • Plant system: Activated sludge

Tabriz Water Treatment Plant (Nahand Dam) -(2008)

Project Description :

  • Client: East Azerbaijan Regional Water Authority
  • Location: Tabriz, East Azerbaijan, Iran
  • Type of Contract: EPC
  • progress: 100%
  • duration of contract: 24 months
  • Project Specification: To increasing Tabriz City potable water potential, Sazehaye Abi Co. is in charge of construction of this water treatment plant with 1000 lit/sec capacity. Raw water would be provided from Nahand dam (20 km away from the plant location). Nahand plant would be operational on 2010 based on the project time schedule.

Water Treatment Plant for Bilesavar-(2000)

Project Description :

  • Client: East Azerbaijan and Ardebil Regional Water Authority
  • Location: Bilesavar, Iran
  • Type of contract: P.C
  • Progress: 100%
  • Duration of Contract: 34 months
  • Project specification: Capacity: 120 lit/sec with future extension capability of 180 lit/sec/
  • Plant system: Non-gravity (Pressure) rapid treatment

Qom City Water Treatment Plant (15th Khordad treatment plant)- (1993)

Project Description :

  • Client: Tehran Regional Water Authority
  • Location: Qom,Iran.
  • Type of Contract: P.C
  • Progress: 100%
  • Duration of Contract: 23 months
  • Project Specification: The project has been executed with cooperation of Metito Co.(Biritish) in form of EPC/Turkey.
  • Capacity: 2.3 m3/sec/
  • Plant System: Clarifacutors and Filtration.