Pump station

    Main Pump station and pipeline of Gordian- Julfa Plain- (1996)

    Project Description :

    • Client: Agricultural land development and improvement Company
    • Location: Julfa, Iran
    • Contract Value: 3.046.235 US Dollar
    • Type of Contract: P.C
    • Progress: 100%
    • Duration of Contract: 30 months
    • Pump Station Capacity: 1.75 m3/sec with 14 Electro Motor- 4.4 MW/
    • Pipeline: Steel pipe dia 900 mm and 4625-meter length

    Golfaraj- Julfa Pump Station and Pipeline-(2002)

    Project Description :

    • Client: East Azerbaijan Regional Water Authority
    • Location: Julfa, Iran
    • Contract Value: 23.246.701 US Dollar
    • Type of Contract: P.C
    • Progress: 100%
    • Duration of Contract: 48 months
    • Project Specification: Supply agricultural water for the Golfaraj plain. The project consists of: Water intake on Aras river, sedimentation tank, pump station, main pipeline, supply, installation and startup of all the Mechanical and Electrical facilities. /
    • pump station: Capacity 6 m3/sec- 10MW/
    • Pipeline: steel and reinforced concrete pipe dia 2000 mm with 5 km length.

    Sixth Pump Station and Pipeline of Moghan Plain-(1984)

    Project Description :

    • Client: East Azerbaijan Regional Water Authority
    • Location: Dasht Moghan, Iran
    • Contract Value: 1.816.930 US Dollar
    • Type of Contract: P.C
    • Progress: 100%
    • Duration of Contract: 18 months
    • Project Specification: Capacity: 2.7 m3/sec- 3.5 MW/
    • Pipeline: Steel Pipe dia 1500 mm and 3000-meter length

    Kish Island Sewage Pumping and Lifting Stations

    Project Description :

    • Geotechnical studies, construction of concrete structures of 8 pumping and lifting stations - construction of drainage valve ponds
    • Client: Kish Investment and Development Company